Oil & Natural Gas 1.4 miles of 30” Steel and 20” HDPE Waterline > Projects > 1.4 miles of 30” Steel and 20” HDPE Waterline We installed approximately 7,250 LF of 20” HDPE DR9 in conjunction with two additional steel gas pipelines for this project. The waterline was installed to convey freshwater to various well pad impoundments for fracking. We also installed one 26” Cased bore under Pennsylvania Route 21 and two stream crossings as part of this project. Some of the unique challenges on this project were traversing three winch hills and installing the waterline with the other two steel gas pipelines in the same 100’ wide ROW because poly lays at a much different pace than steel. Most of this line was placed in its own ditch (single) except at stream crossings, where all pipelines were placed in one large common ditch. PROJECT DETAILS: Location: Pennsylvania 21208 - Creek Crossing 5-15-19 (7) 21208 - Creek Crossing 7-9-19 (4) Close 21208 - Creek Crossing 5-15-19 (7) 21208 - Creek Crossing 7-9-19 (4)
We installed approximately 7,250 LF of 20” HDPE DR9 in conjunction with two additional steel gas pipelines for this project. The waterline was installed to convey freshwater to various well pad impoundments for fracking. We also installed one 26” Cased bore under Pennsylvania Route 21 and two stream crossings as part of this project. Some of the unique challenges on this project were traversing three winch hills and installing the waterline with the other two steel gas pipelines in the same 100’ wide ROW because poly lays at a much different pace than steel. Most of this line was placed in its own ditch (single) except at stream crossings, where all pipelines were placed in one large common ditch. PROJECT DETAILS: Location: Pennsylvania 21208 - Creek Crossing 5-15-19 (7) 21208 - Creek Crossing 7-9-19 (4) Close 21208 - Creek Crossing 5-15-19 (7) 21208 - Creek Crossing 7-9-19 (4)